4th Steet to 5th Street and 6th Street to 7th Street


Project Overview

The City-contracted contractor, 605 Companies, Inc. , will be reconstructing roads and utilities in two phases. The first phase will take place on Lovely Avenue from 6th Street to 7th Street. The second phase of construction on 4th Street from Nidaros Avenue to Morefield Avenue, proceed across the open field south of the high school, and connect to 5th Street. The purpose of the project is to install watermain that will increase system redundancy and water quality.




Project Schedule

Phase 1: Substantially Complete

  • Work along phase 1 is substantially complete with driveway replacements remaining to be completed.
  • Watermain along this phase has been installed and is live to the City water system.

Phase 2: Substantially Complete

  • Work Completed:
    • Installation of watermain.
    • Installation of sanitary sewer.
    • Installation of storm sewer.
    • Paving of 4th Street and Nidaros Avenue.
    • Street patching on 6th and 7th Street.
  • Work to be Completed:
    • Driveway replacement.
    • Punch list items.
Construction map

Click on image to view larger map.




Construction Reminders + Updates

November 7, 2024

  • Survey control points, staking hubs, and lath will be installed periodically throughout construction to facilitate construction of the project to the proposed design.
    • Survey crews will place these in the right-of-way.
    • Please refrain from disturbing hubs and lath. It is the contractors responsibility to remove the hubs and lath once they are no longer needed.
  • During the service reconnections, water service will be unavailable for a short duration.
    • 605 Companies, Inc. will notify each homeowner 48 hours in advance of service interruptions and will provide an estimated timeline for the service outage.
    • Service outages will generally be no longer than 4 hours and will be completed during normal working hours of 8 a.m. to 5 p.m.
  • ISG is the City Appointed Engineer and will be performing construction observation on the project.
    • ISG will be on-site while the contractor performs the work and will be available to address any questions you may have.